What does a tenant improvement existing conditions survey include?
• Suite boundaries and demising walls located against the base building.
• Drawn to your CAD template, layers and naming.
• Visible plumbing, HVAC and electrical rough-in located by position and size.
• A baseline designers can use before construction documents are finalized.
• Model tolerance agreed to scope and documented, not assumed.
• Deviation report documenting model-to-point-cloud accuracy, available on request.
• Capture is scheduled around tenants and building hours; access rules are confirmed before mobilization.
• Added deliverables can be drawn later without a new site visit.







